Projects · Houston, Greenway area

Medical clinic and MRI build-out on Richmond Ave

A two-story medical building in Houston, remodeled for a specialty clinic with its own MRI suite. We handled the interior from demolition to ceiling tile, working for the general contractor alongside the shielding company, the structural work and the MEP trades.

The project

The building is a two-story medical office on Richmond Ave, in Houston’s Greenway and Upper Kirby area. The owner remodeled it for a specialty clinic built around an in-house MRI, with exam and consultation rooms, restrooms, staff areas and the imaging suite. The general contractor was Frank Hilson’s team (Custom Redesign / Texas Image), and we were the interiors subcontractor.

First, one wall at the stair

The first piece of work, in December 2025, was small but fussy: framing a new wall about ten feet long above the existing pony wall at the stairway, all the way to the deck. We framed it, hung board on both sides, then taped, floated, skimmed and sanded it ready for paint. The ceiling ran through the line of the new wall, so we cut back the grid, installed wall angle on both sides and put the tees and tile back.

Then the full interior

We covered the full interior build-out:

  • Demolition downstairs. Walls, doors, cabinets and the suspended ceiling removed and the floor cleaned up for layout.
  • Steel stud framing. Walls in 3-5/8" and 6" metal studs, some all the way to the deck and some to 6" above the grid, as the wall types required.
  • Drywall. 5/8" Type X board throughout, and purple moisture- and mold-resistant board in the bathrooms.
  • Finishing. Tape, float, skim, sand and touch up.
  • Doors. Twelve frames and doors, installed labor-only: 2 pocket doors, 3 four-foot doors, 2 forty-two-inch doors and 5 three-foot doors.
  • Ceilings. 15/16" suspended grid with Armstrong Dune 2×2 reveal-edge tile, plus a separate area of all-aluminum 15/16" grid with the same tile.
  • Insulation. R-11 batts in all walls.

Working around the structure

Midway through, the building needed new structural beams upstairs. We demolished a 10×12 area of ceiling so the steel could go in, then reinstalled the grid and ceiling. Where drywall had to come off for the beams, we removed it, re-hung it and finished it to match. We also framed a new wall at the stairs and around an upstairs window to the deck, and repaired the suspended ceiling where it met the new work.

Building next to an MRI

An MRI suite brings its own rules. The magnet room is lined with an RF shield built by a specialist company, and inside and near the magnet, ferromagnetic materials are restricted. That is why part of the ceiling went in as all-aluminum grid. We fit our work into the shielding contractor’s sequence and the general contractor’s schedule, and kept steel out of the places where it wasn’t allowed.

Our guide to drywall and ceilings in medical and MRI rooms covers what changes in these spaces.