Walls, framing & finishes

Commercial metal stud framing: sizes, gauges and wall heights

Steel studs look simple: a C-shaped channel, a top track and a bottom track. The choices behind them, like stud width, steel thickness, wall height and how the top of the wall is detailed, decide whether the wall stays flat, passes inspection and keeps sound where it belongs.

Key takeaways

  • 3-5/8" studs are the everyday interior partition. 6" studs carry plumbing, taller walls and heavier loads.
  • Stud thickness and spacing follow the manufacturer’s limiting-height tables, the wall height, the finish and any rated assembly.
  • Walls to the deck need a head detail that lets the structure move. Walls that stop above the ceiling need bracing.
  • Backing for cabinets, grab bars and equipment has to go in before the board. Locate it early.

The parts

Non-structural steel framing for interior walls is covered by ASTM C645. A wall is built from track, a U-shaped channel fastened to the floor and to the structure or ceiling above, and studs, C-shaped members that sit in the track at a regular spacing, usually 16 inches on center for commercial work. Headers and jambs frame the openings, and bridging or bracing keeps tall walls from twisting.

Widths: 3-5/8" and 6"

Studs come in several widths, from 1-5/8" furring studs up to 6" and beyond. On most build-outs, two widths do most of the work:

  • 3-5/8" is the standard interior partition between offices, exam rooms and corridors. It takes a standard electrical box and R-11 batts.
  • 6" is used for plumbing walls, taller walls, walls that need to be stiffer, and walls with more insulation or larger utilities inside.

At our Richmond Ave project the plans used both: 3-5/8" for most partitions and 6" where the wall types called for it.

Thickness: gauges and mils

Steel thickness used to be described by gauge (25, 20, 18, 16), where a bigger number means thinner steel. Manufacturers now also list the base metal thickness in mils (thousandths of an inch), which is clearer. Lighter studs are easier to cut and screw and often perform better acoustically; heavier studs are stiffer and go taller. The right choice comes from the manufacturer’s limiting height tables, which give the maximum height for a stud size, thickness and spacing at a given deflection limit:

  • Building codes generally require interior walls taller than 6 feet to resist a small lateral load, 5 pounds per square foot, from people and equipment leaning on them.
  • The allowed deflection depends on the finish. Walls with ordinary gypsum board finishes are typically designed to L/240; tile, stone and brittle finishes need stiffer walls, often L/360 or more.
  • Door jambs need extra strength. Heavier studs or doubled studs at the jambs, as the frame manufacturer and the drawings require, keep the frame from loosening over thousands of swings.

How high: three common wall heights

Three common interior wall heights A building section with the structure above, a suspended ceiling, and three walls. Wall A runs full height to the deck with a deflection track at the top. Wall B stops six inches above the ceiling grid and is braced back to the structure with a diagonal kicker. Wall C is a pony wall about forty-two inches high with a cap, sometimes with a new wall framed above it. ABC DEFLECTION TRACK KICKER BRACE 6" ABOVE GRID CAP · ~42" FRAMED ABOVE,TO DECK, WHENTHE PLAN CALLS CEILING GRID Full height to deck Fire-rated walls, soundwalls, security, examand MRI-adjacent rooms Above the ceiling, braced Ordinary office partitions;sound travels over the topthrough the plenum Pony wall Stair rails, receptioncounters, half walls
Three wall heights you’ll see on one floor plan. A runs full height to the structure, B stops above the ceiling and is braced, C is a pony wall that may get a new wall framed above it.

Full height to the deck. Fire-rated walls, smoke partitions, sound walls and security walls typically run to the underside of the floor or roof above. Because that structure moves under load, the top of the wall needs a deflection track: a deep-leg or slotted track that lets the structure come down without crushing the studs or cracking the board. In rated walls, the joint at the top must match a listed head-of-wall system.

Above the ceiling, braced. Many office partitions stop about 6 inches above the ceiling grid. Without something tying the top of the wall to the structure, the wall can rock, so it gets kickers: diagonal braces from the top track up to the structure at intervals. These walls are cheaper but let sound travel over the top through the ceiling space.

Pony walls and partial heights. Half walls at stairs, reception counters and open work areas need posts or extra bracing so they don’t wobble. When a renovation turns a pony wall into a full wall, as we did at the stair at Richmond Ave, the new framing is tied into the old and run to the deck.

Backing: the item that’s always forgotten

Gypsum board on light-gauge studs can’t hold a wall cabinet, a grab bar or a 75-inch monitor. Backing, steel plate or strap set between studs or fire-retardant-treated wood where allowed, goes in during framing at the right height. In medical buildings that list is long: grab bars, wall-hung sinks, exam lights, monitor arms, dispensers, handrails and cabinets. Get the locations to the framer before board goes up, because adding backing later means cutting open finished walls.

Layout and coordination

  • Check the drawings against the building before layout: column locations, window mullions and existing walls often disagree with the plan by a few inches.
  • Confirm door sizes and frame types so rough openings are right.
  • Coordinate with MEP rough-in, especially plumbing walls and outlet locations in sound walls.
  • Walk the layout with the superintendent before the first stud. Moving a chalk line is free; moving a wall isn’t.

Common questions

Should interior walls go to the deck?

Fire-rated walls, smoke partitions, walls that need real sound isolation and security walls generally do. Ordinary office partitions often stop a few inches above the ceiling grid and are braced to the structure. The wall types on the drawings decide; if they don’t, ask the architect.

What are EQ studs?

Equivalent, or EQ, studs are made from thinner, higher-strength steel with stiffening ribs, and are marketed as equivalent to a conventional gauge. They can be a good choice, but only where the manufacturer’s data supports the height and load, and where any fire-rated or sound-rated assembly on the job allows them.

Do metal studs need backing for cabinets and grab bars?

Yes. Light-gauge studs can’t hold screws for heavy items on their own. Backing, usually steel plate or strap or fire-retardant-treated wood, goes in before the board, at the locations shown on the drawings or given by the owner.

Have plans to price?