Services · Doors & frames
Door and frame installation
Frames set while we frame the walls, so openings are the right size, jambs are plumb and the doors swing the way the plan shows.
Hung by the crew that built the wall
Doors go in best when the people framing the wall are the people setting the frame. The rough opening is right, the jamb studs are where the frame anchors need them, and the frame is plumb and square before the board goes up. That saves the hardware installer a day of shimming and the owner a door that never quite latches.
- Hollow metal frames set and anchored in steel stud walls
- Pocket doors, framed and installed so the door slides clean
- Wide doors, including 42-inch openings for exam rooms, imaging and patient transport
- Doors hung and adjusted, ready for hardware
- Labor only, with owner- or GC-furnished doors, or priced with materials
Twelve openings on the Richmond Ave job
For the medical clinic on Richmond Ave we installed 12 frames and doors on a labor-only basis: 2 pocket doors, 3 four-foot doors, 2 forty-two-inch doors and 5 three-foot doors. The wider doors serve rooms where patients may arrive on a stretcher or in a wheelchair with an escort.
Doors & frames
Common questions
Do you install hardware?
We hang the doors and leave them ready for hardware. Many projects use a separate hardware supplier and installer; if you want hardware in our scope, tell us on the bid request.
Can you install doors the owner already bought?
Yes. Labor-only installation of furnished frames and doors is common, and it’s how we did the doors on Richmond Ave.
When should frames go in?
During framing. Setting frames as the walls go up makes for better openings than setting them after the board is hung.
Have plans to price?
Send drawings or a scope sheet. We price framing, board, finish, grid, insulation and doors as one package, line by line.