Commercial metal stud framing
Light-gauge steel partitions laid out from the plans and checked against the doors, ceilings and other trades: walls to the deck, walls that stop above the grid, furring, soffits, bulkheads and the backing nobody remembers until the cabinets arrive.
Framing is where a good interior starts
Every other trade inside the walls depends on the framing being where the drawings say it is. We snap the layout from the plans, confirm door openings and ceiling heights before the first stud goes in, and walk it with the superintendent when something on paper doesn’t fit the building.
- Interior partitions in 3-5/8" studs, and 6" studs where the wall carries plumbing, taller spans or the plans call for it
- Full-height walls to the deck with a deflection track at the top, for fire-rated walls, sound walls and security
- Walls to 6" above the grid, braced back to the structure with kickers
- Furring, soffits and bulkheads to hide duct, pipe and beams
- Backing and blocking for grab bars, wall-hung sinks, cabinets, monitors and handrails
- Door openings framed to the frame manufacturer’s rough openings, with the jamb studs the door needs
Built to the details that matter
A wall that stops short of the deck lets sound and smoke over the top, so we read the wall types carefully. Rated walls follow the tested assembly listed on the drawings, down to the stud size, spacing and screw pattern. Where the structure above will move, the top of the wall has to be able to move with it, and we install the slotted or double track the detail calls for.
On the Richmond Ave job we framed in two stud widths, some walls to the deck and some to 6" above the grid, and framed new walls above an existing pony wall at the stair and around an upstairs window, all the way to the deck.
Metal stud framing
Common questions
Do you frame walls to the deck or just above the ceiling?
Whichever the drawings call for, and often both on the same job. Fire-rated, sound and security walls usually run to the deck; ordinary office partitions often stop 6 inches above the grid and get braced to the structure. If the plans don’t say, we ask before we build.
Do you install backing for cabinets and grab bars?
Yes, if it’s on the drawings or the owner tells us where it goes. Backing is cheap before the board goes up and expensive after, so we ask for the casework and accessory locations early.
Can you frame around structural work?
Yes. On the Richmond Ave project we opened an area upstairs so structural beams could be installed, then framed, boarded and finished around them.