Key takeaways
- Medical rooms need far more backing than offices: grab bars, sinks, exam lights, monitors, dispensers and handrails.
- Expect wider doors, tougher board in corridors, washable ceiling tile in clinical areas and sound-rated exam rooms.
- X-ray and CT rooms get lead-lined board to the physicist’s design. Seams and penetrations must stay shielded.
- MRI rooms are built around an RF shield and restrict ferromagnetic materials, which means non-ferrous ceiling grid and careful fastening.
What makes a medical build-out different
Most of a clinic is built from the same parts as an office: steel studs, 5/8" Type X, tape and float, suspended ceilings. The differences are in the details, and they’re easy to miss at bid time.
- Backing everywhere. Grab bars in every restroom, wall-hung sinks in exam rooms, exam lights, monitor arms, glove and sanitizer dispensers, handrails, casework. Each needs backing in the right place before board goes up.
- Wider doors. Exam rooms, imaging and procedure rooms often get 42-inch or 4-foot doors for wheelchairs, stretchers and equipment. At Richmond Ave we installed 42-inch and 4-foot doors alongside standard 3-foot doors and pocket doors.
- Tougher, cleaner surfaces. Abuse-resistant board and corner guards in corridors with carts; washable or vinyl-faced ceiling tile in clinical and procedure areas.
- Privacy. Insulated exam room walls, often to the deck, with sealed edges and offset outlets.
- Moisture. Moisture- and mold-resistant board in restrooms, soiled utility rooms and around sinks.
X-ray and CT rooms: lead-lined drywall
Rooms with X-ray, CT, fluoroscopy and similar equipment need radiation shielding. A medical physicist calculates it for each room, and the result usually shows up on the drawings as lead-lined gypsum board on certain walls, at a given lead thickness and to a given height, often 7 feet above the floor. The details that matter to the installer:
- Seams must overlap. Lead strips behind the joints keep the shielding continuous.
- Penetrations are covered. Electrical boxes, pipes and ducts in shielded walls get lead backing so they don’t leave holes in the shield.
- Doors and frames are shielded too, as are control room windows, and the wall shielding has to meet them without gaps.
- Fasteners follow the board manufacturer’s instructions.
The physicist often surveys the finished room. Gaps found then are expensive to fix, so the shielding is inspected before it’s covered up.
MRI rooms: the shield and the magnet
An MRI scan room is built around an RF shield, a continuous enclosure of copper or other metal panels installed by a specialist shielding company. It keeps outside radio interference from spoiling the images. Inside and near the magnet, ferromagnetic materials are restricted, because the magnet is always on and pulls on steel.
For the trades that build the room around the shield, that means:
- Don’t fasten through the shield. Every screw through the enclosure is a potential leak, so framing and finishes attach where and how the shield company allows.
- Use non-ferrous materials where required. At Richmond Ave the imaging area got all-aluminum 15/16" ceiling grid with the same 2×2 tile as the rest of the building. Framing, fasteners and hangers in the scan room follow the shield company’s and the scanner vendor’s material lists.
- Work in the right order. The shield goes in, gets tested, and only then is covered. Our work fits around that sequence and the general contractor’s schedule.
- Respect the zones. Once the magnet is on site and energized, access to the scan room is controlled. Tools and materials are screened before anyone goes in.
Working in occupied medical buildings
Renovations inside working clinics and hospitals often require an infection control plan: dust barriers, sealed doors, negative air in the work area, walk-off mats and scheduled clean-up. The owner or the general contractor sets the requirements. We build the temporary partitions and work to them.
Common questions
Who installs the RF shield in an MRI room?
A specialist shielding company, usually under the general contractor, to the scanner vendor’s requirements. The drywall and ceiling trades build around it and must not fasten through it.
Who decides how much lead goes in an X-ray or CT room?
A qualified medical physicist, in a shielding design for that room. The drawings show which walls get lead-lined board, at what thickness and to what height.
Do medical offices need special drywall?
Mostly the same 5/8-inch Type X as other commercial work, with moisture-resistant board in wet areas, abuse-resistant board where carts and stretchers travel, and much more backing. Imaging rooms add lead-lined board and non-ferrous materials.